RISA Headquarters will be closed Monday, September 1st for Labor Day. We will be open at 6am PT on Tuesday, September 2nd.
LOGIN
BUY
2min
Anchorage design is per ACI 318-19 & ACI 318-19(22) and can be utilized under the Column Base Plate connection module.
Reach an Engineer
Training
Case Studies
Products
RISAConnection
64min
RISAFloor, RISAFoundation, RISAConnection, RISA-3D
77min